Cementos Avellaneda is carrying out a project aimed at increasing the capacity of the San Luis Plant.
SIC TEC is contracted to carry out the required works corresponding to the construction engineering of concrete and verification of metal structures according to CIRSOC regulations in force in the Argentine Republic.
For this project, 271 civil documents were developed, including 196 plans, 68 calculation reports and 7 data sheets.