ST-3234-01

New Topping - Design, Engineering and Construction Assistance

YPF decides to increase its production capacity and improve the operational flexibility of the plant.

SIC TEC is contracted to carry out the Basic and Detailed Engineering of the New Topping III at the Luján de Cuyo refinery.

157 process documents were developed, 112 mechanical, 143 electrical, 430 instrumentation and control, 334 civil and structural, and 1240 piping.

Client: YPF
Objetives: Increase the capacity, quality and flexibility of crude oil processing at the refinery
Start: 2014
End: 2017
Location: Mendoza.