ST-4855-01

TK01 Degasser - PTC TUP” ​

The scope includes the preparation of the CAO (As Constructed) engineering and the construction of a Degasser for the TK 01 cutter tank, also including all the inlet and outlet piping connections, provision and assembly of equipment, provision and connection of instruments as well as their electrical or instrumental conduits up to JB at the foot of the equipment.

Client: Phoenix
Date: 2024

Gas leaks in Tupungato

The scope consists of the manufacture of seven equipments called GAS DRIPS and the preparation of the CAO (As per Work) engineering. These equipments are designed to capture liquid in the existing gas pipeline network.

Client: Phoenix
Date: 2024